1. |
Basically, all measurements in this manual are taken with a tracking
gauge.
|
2. |
When a measuring tape is used, check to be sure there is no elongation,
twisting or bending.
|
3. |
For measuring dimensions, both projected dimension and actual-measurement
dimension are used in this manual.
|
Installation
1.
Installation is the reverse of removal.
•
...
Installation
1.
Install the DRL unit.
2.
Install the glove box.
...
Installation
1.
Place the thermostat in the block.
Install the thermostat (B) with the jiggle valve
upward.
2.
Install the water inlet fitting ( ...