Inspection
1. |
Connect the GDS on the Data Link Connector (DLC).
|
2. |
Turn the ignition switch ON.
|
3. |
Measure the output voltage of the APS 1 and 2 at
C.T and W.O.T.
|
Removal
1.
Turn the ignition switch OFF and disconnect the battery
negative (-) cable.
2.
Lift the vehicle.
3.
D ...
Installation
Be sure to install the harness wires not to be pinched or interfered
with other parts.
...
Installation
•
Install the component with the specified
torques.
•
...