Inspection
1. |
Disconnect the vapor hose from the intake manifold
and connect a vacuum pump to the nipple on the intake manifold.
· At Cold Engine [Engine Coolant Temperature < 60°C(140°F)]
|
2. |
Check the following points with applied vacuum at
the purge control solenoid valve (PCSV).
· At Warmed Engine [Engine Coolant Temperature. 80°C(176°F)]
|
1. |
Turn ignition switch OFF and disconnect the negative
(-) battery cable.
|
2. |
Disconnect the PCSV connector (A).
|
3. |
Disconnect the vapor hose (B) which is connected
to the intake manifold from the PCSV.
|
4. |
After connecting a vacuum pump to the nipple, apply
vacuum.
|
5. |
With the PCSV control line grounded, check the valve
operation with battery voltage applied to the PCSV(Open) and removed(Closed).
|
6. |
Measure the coil resistance of the PCSV.
|
1. |
Select "Evap. Leakage Test".
|
2. |
Proceed with the test according to the screen introductions.
|
Removal
1.
Disconnect the negative (-) battery terminal.
2.
Using a screwdriver or remover, remove the center fascia garnish
(A).
...
Installation
Front Speaker
1.
Install the front speaker.
2.
Install the front door trim.
Rear Speaker
1.
Install t ...
Installation
•
Do not turn the ignition switch ON and do not contact
the battery cable while replacing the ...