Hyundai Accent: Inspection| 1. |
Connect the GDS on the Data Link Connector (DLC).
|
| 2. |
Measure the output voltage of the MAPS at idle and
IG ON.
|
RemovalDescription and Operation
Description
The charging system included a battery, an alternator with
a built-in regulator, and the charging indicator light and wire.
The Alternator has eight built-in diodes, each rectif ...
Inspection
1.
Check the bushing for wear and deterioration.
2.
Check the lower arm for deformation.
3.
Check the all bolts ...