Inspection
1.
Immerse the thermostat in water and gradually heat
the water.
2.
Check the valve opening temperature.
...
Installation
1.
Installation is reverse of removal.
PCV Valve installation:
7.8 ~ 11.8 N.m (0.8 ~ 1.2 kgf.m, 5.8 ~ 8.7
lb-ft)
...
Removal
1.
Remove the battery and the battery tray.
(Refer to "Charging system" in EE group.)
2.
Remove the under cover (A).
...