Hyundai Accent: Specifications
SpecificationsECM Problem Inspection Procedure
1.
TEST ECM GROUND CIRCUIT: Measure resistance between
ECM and chassis ground using the backside of ECM harness connector as
ECM side check point. If the problem is fo ...
Inspection
1.
Connect the GDS on the Data Link Connector (DLC).
2.
Measure the output voltage of the FTPS.
Specification:
...
SS-B Solenoid Valve(ON/OFF). Specifications
Specifications
ON/OFF Solenoid Valve(SS-A, SS-B)
▷ Control type : Normal low type
Control pressure kpa (kgf/cm², psi)
490.33(5.0, 71.12)
...