Hyundai Accent: Inspection| 1. |
Operate the switch and check for continuity between terminals.
|
Installation
Rheostat. Repair proceduresInspection
1.
Connect the GDS on the Data Link Connector (DLC).
2.
Measure the output voltage of the RPS at idle and
various engine speed.
...
Inhibitor Switch. Description and Operation
Description
Inhibitor Switch monitors the lever's position(PRND) and is used to control
gear setting signals.
...
Parking brake
Checking the parking brake
Check the stroke of the parking brake by counting the number of “clicks’’ heard
while fully applying it from the released position. Also, the parking brake alone ...